5

OverviewVersionsHelp

Facsimile

Transcription

Status: Complete

Light-House Board,
97-7-90-91-1,000 Office of Light-House Engineer
Thirteenth District,
Portland, Oregon
October 17, 1984.

To the Light-House Board.
Sirs:
I have the honor to ask authority to procure by open purchase the articles named below, and to dispense with advertisement and formal contract, the case being one where immediate delivery or performance is required such pubic exigency as is provided for in Section 3709 of the Revised Statues.
Respectfully, yours,
Jose Pool
Major Corps of Engineers, U.S.A.
Engineer 13th Light-House District.

No. or Quantity Articles Application Estimated Cost

1 Window Frame 6.00
& sash
3.5 lbs Portland cement 91.00
80 ft Copper strip 12.00
1 g.i. elbow .25
8 ft 3” g.i. conductors Repairs to dwelling and barn, .96
2 “ 4” “ “ cementing cellar floors, drainage of 8.40
2 pcs. galv. Iron 13’x20” grounds at Cape Foulweather Light 4.20
3 lbs shingle nails Station, Oregon. .20
2 “ Copper “ .90
200 ft 3” drain tiling 5.00
150 “ 4” “ “ 4.50

133.41

*To be paid for from funds in hand
Appropriation for Repairs of Light House 1895

*State whether funds are “in hand,” “allotted,” or request is made for allotment.

Notes and Questions

Nobody has written a note for this page yet

Please sign in to write a note for this page