Robinson_09051867__0459
Facsimile
Transcription
11 — For Culvert Masonry and Foundation for
Trestle Work (dry) per cubic yard, Class 4 15.
12 — For Slope or Retaining Wall, including paving
for foundations of structures (dry)
per cubic yard, Class 5 8.
13 — For Brick Work in Cement, per thousand, Class 6 27.
14 — For Blind or French Drains (dry) per cubic yard, Class 7 2.50
15 — For Cement mortar, per cubic yard 7.
16 — For Lime Mortar, per cubic yard 4.50
17 — For Timber in Truss Bridges of spans from 149
to 201 feet, per M feet, B. M.
18 — For Timber in Truss Bridges of spans from 99
to 151 feet, per M feet, B. M.
19 — For Timber in Truss Bridges of spans from 49
to 101 feet, per M feet, B. M.
20 — For Timber in Truss Bridges of spans from 14
to 51 feet, including all Farm and Road
Bridges, per M feet, B. M. 60
21 — For Timber in Stringer Bridges, Trestling and
Timber Piers, per M feet, B. M. 60.
22 — For Timber and Plank in Foundations,
per M feet, B. M. 45.
23 — For Timber in Piling, per M feet, B. M.
24 — For Driving the same, per linear foot under
surface, per linear foot
25 — For Wrought Iron in all structures per pound .12
26 — For Cast Iron in all structures per pound .7
27 — For Spikes and Nails in all structures per pound .7
[bottom left margin:] 15
33
Notes and Questions
Nobody has written a note for this page yet
Please sign in to write a note for this page