SR_DPI_DNE_Special_Subject_File_B5F1_Durham_NC_College_Negroes_131
Facsimile
Transcription
Department of Public Instruction
State of North Carolina
Raleigh
DIVISION OF NEGRO EDUCATION
N. C. NEWBOLD, DIRECTOR
MISS ANNIELEA PRATT, SECRETARY
W. H. A. HERRING, ASSISTANT DIRECTOR
W. A. ROBINSON, SUPERVISOR
TEACHER TRAINING AND HIGH SCHOOLS
A. T. ALLEN, STATE SUPERINTENDENT PUBLIC INSTRUCTION
W. F. CREDLE, SUPERVISOR OF SCHOOL PLANT PLANNING
MISS PEARL FAULKNER, SUPERVISOR HOME ECONOMICS
G. E. DAVIS, SUPERVISOR INDUSTRIAL BUILDINGS
MRS. ANNIE W. HOLLAND, SUPERVISOR OF ELEMENTARY SCHOOLS
F. R. HUTTY, SUPERVISOR OF CONSTRUCTION
-3 -
of future locations will cost approximately $500.00 or $600.00. This
includes labor and stakes, but does not include the electrical wiring or
plumbing to each individual unit, which would be an additional cost.
Acting on the advice of the fire chief, Mr. Bennet, of the
Darien Fire Department, he has been notified of the date the Board will
vote to begin construction. The Board will not likely wish to place be-
fore the Department for consideration this matter concerns fire protection
of the present buildings.
Upon investigation I find that the sewer and water mains have
not as yet been extended both being run by the city double.
The architect will state that the use of temporary
buildings on the same slope will make the residence side of the school
unattractive.
Very sincerely yours,
Frank L. Hussey,
Supervisor of Construction.
Notes and Questions
Nobody has written a note for this page yet
Please sign in to write a note for this page