Pages That Mention Charles F. Brown
1870-73 Lighthouse Board Annual Reports
22
1871. June 26.
From Engineer Secretary Major G. H. Elliot. To Major H. M. Robert Corps Engineers.
Sir:
Your letter of the 12th instant is received and the award of contract for building Light Keeper's dwelling at Cape Disappointment, W. T. (Washington Territory) to Charles F. Brown for $9,890., gold coin is approved.
July 10.
From Engineer Secretary Major G. H. Elliot. To Major H. M. Robert Corps Engineers.
Sir:
Your letter of the 27th instant, relative to Yaquina Light House, is received.
The Lantern has been paid for by Gen. Duane from funds sent to him from this Office for the purpose.
July 10.
From Engineer Secretary Major G. H. Elliot. To Major H. M. Robert Corps Engineers.
Sir:
I enclose herewith for your information a copy of a letter from the Department appointing Mr. C. B. Talbot as additional draughtsman at $150 per month.
For Enclosure see Volume 288 page 46 of Letters Received.
32
1873 All errors or omissions in the last list should be corrected. The light House Lists corrected as herein required, should be mailed to arrive at this office on or before the 1st of December next.
Sept. 3 From engineer Secretary Major G.H. Elliot To Major H.M. Robert Corps Engineers Sir: The Board desires that you will at once report in full the present condition of the Light House at Cape Foulweather and the appropriate time it will be lighted.
Sept. 8 From Engineer Secretary Major G.H. Elliot To Major H.M. Robert Corps Engineers Sir: The extension of time, sixty day, recommended by your letter of the 21st August, to be granted to Charles F. Brown contractor for Light Keeper's dwelling at Cape Foulweather, Oregon is approved.
Sept. 17 From Naval Secretary Rear Adml. C.S. Boggs To Major H M Robert Corps Engineers Immediate repairs at Dungeness authorized
On Side Cape Foulweather L.H. condition Cape Foulweather L.H. keepers dwelling - extension of time on contract Telegram