1871-1872 keeper selection and LH building Vol. 336
15
Office of the Light House Engineer,
PORTLAND, OREGON, Sept 7 1872
SIR: I have to submit the following Report of Operations for the month of August 1872: Cape Foulweather Lt. Station, Ogn. Brick work completed in Tower 6 ft above lower floor, & in Oil House 4 ft above floor. Received & cleaned Metal Work ere??? “Shubrick”. Placed stone steps & sills, & Iron Work as far as work (Brick) has progressed. Shipped 1 Cargo Bricks Cement & Lime from San Francisco. Keepers' Dwelling enclosed, floors laid, 2 coats paint outside, 1 coat plaster on 1st floor, & lathed on 2nd floor. Probably Operations in September. Receive cargo, & ship balance of materials, including, lantern, from San Francisco. Continue work with full force of men on Lt. Ho. & Dwelling. General Work. Engaged on Estimates for Repairs & Improvements.
Very respectfully, Your obedient servant Henry M. Robert Maj. Of Eng’rs & L.H. Eng’r Thirteenth District.
30
Office of the Light House Engineer Thirteenth District
Portland, Oregon, Jan 15, 1873
Prof Joseph Henry: Chairman Light House Board Washington, D. C.
Sir: The following telegram has been this day sent you: Sixteen lantern deck-plates, and sixteen cases Lantern Apparatus received at Foulweather. Following at missing: eight lantern posts, sixteen floor lights, sixteen rafters, and sixteen tie-rods. Gene Michler telegraphs "not in San Francisco."
Very respectfully, Your obedient servant, Henry M. Robert Maj. of Eng'rs & L. H. Eng'r, Thirteenth District
1870-73 Lighthouse Board Annual Reports
29
1872.
instant, you are authorized to enter into contraction written tenders for material, labor and transportation for Cape Foulweather Light House, requiring an answer within ten days and sending the tenders to the most reliable parties.
There is a clause in the appropriation bill which, if passed, will hold the appropriation good for two years from the time the site is obtained and jurisdiction ceded. You will be further informed on this point after the passage of the bill.
May 21.
From Naval Secretary C. S. Boggs. To Major H. M. Robert. Coprs Engineers.
Sir:
In reply to your letter of the 6th instant relative to Light House reservation at Yaquina, I have to say that the 20 acres referred to should be surveyed and permanent parks planted and report should be made as to whether these 20 acres will be sufficient for the purpose.
May 24.
From Naval Secretary Rear Adml. C. S. Boggs. To Major H. M. Robert. Corps Engineers.
Sir:
Referring to your letter of the 6th instant, relative to separation of funds, I have to say that as there is still some misunderstanding between the First National Bank at Portland and the [ Treasurer of the United States, you will please inform the Cashier of the Bank, that you should be mentioned in his reports as Light House Engineer.
35
1872
Nov. 8. From Engineer Secretary Major G. H. Elliot. To Major H. M. Robert. Corps Engineers.
Sir: Referring to your telegram of the 5th instant, I have to inform you that Major Michler, the Light House Engineer at San Francisco, has been directed to look for the Cape Foulweather lantern and report to you.
Nov. 9. From Engineer Secretary Major G. H. Elliot. To Major H. M. Robert. Corps Engineers.
Cape Disappointment Oil House approved Ediz Hook not approved.
Dec. 30. From Engineer Secretary Major G. H. Elliot. To Major H. M. Robert. Corps Engineers.
Fix a date by telegraph on which Foulweather can certainly be lighted.
1873.
Jan. 2. From Engineer Secretary Major G. H. Elliot. To Major H. M. Robert Corps Engineers.
Sir: I have to acknowledge your telegram of Dec. 21, ultimo, relating to the lighting of Foulweather Light, and to say that the notice to mariners will be made accordingly.