19
Facsimile
Transcription
FORT WORTH.
CITY WATER WORKS
A. W. SCOBLE, Superintendent
H. L. CALHOUN, Secretary
FORT WORTH, TEXAS, Dec.14th.03 190 ______
Hon.Mayor and City Council.
Gentlemen:-
I beg to call your attention to the necessity of
laying a water main on Magnolia Ave, from Evans to Louisiana, and on
Louisiana from Magnolia to Leuda street for fire protection, as this is
a densly settled territory in which is situated the 7 th, Wrad school
building. The cost of the work will be as follows:
Magnolia Ave,,
796 feet 8 inch C.I.pipe, | $78o.08 | |
2 Fire hydrants | $7o,00 | |
2-8x6 T's, and I-8 inch valve | $33.00 | |
Total | $883.08 |
2492 feet 6 inch cast I. pipe | $I.869.00 | |
9 6x6 crosses, 7-6x6 T's, I5-6" plugs | 95.00 | |
7 Fire hydrants | $245.00 | |
3-6 inch valves, and box(s | 55.00 | |
Total | $2.264.00 | |
Total entire line | $3,I47.08 |
A. W. Scoble
Superintendent.
I respectfully ask that the above work be done as set out by
Superintendent Scoble, same being so badly needed, having no fire
protection in this territory.
J. F. Henderson
Alderman 7 th, ward.
Approved
W. H. Ward
T. F. Murry
Notes and Questions
Please sign in to write a note for this page