CB03_0423

OverviewTranscribeVersionsHelp

Facsimile

Transcription

Status: Indexed

[right]

H.B. Mackintosh Esq

Dear Sir

The items of the charge
against Lot #4288 Holman Prop. are
as follows.


Building Foundation 7.00
4 8in Octagonal Posts 16.00
462 Ft sods 16.17
18 Loads Loam 19.80
1 [load] Manure 3.25
6 days Labor Grading 15.75
Cutting Lumber 3.00
[Total] $80.97
No extra charge for changing the Grade
after the first sodding was put on.

Very Respectfully
JW Lovering Supt. per Childs

423

Notes and Questions

Please sign in to write a note for this page

kelseydchung

Left side is difficult to read/illegible.