Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.

2 revisions
kishman at Sep 18, 2020 12:54 PM

712 [=73] (V.2)

712

[note in left margin:

Part III
Chap. 1
previous part sent to
printer May 22/60.]

situated in the centre of the bed
of the river; at the highest point
D Mr. Login established the end
of one of the permanent embank-
-ments, similar to that at the
Puttri and in shape and di-
-mension as follows:

[drafted diagram of embankment follows, text reads:

Diag. LXXXIII

Plan

Section

25'

50']

the triangular superstructure
being made of [Kurries?] or rafters
15 feet in length, of which species
of material the piling and ne-
-cessary protection were also
made. The exposed or salient
end X was left as open frame
work for the water to break upon,
and the rest was filled with vitri-
-fied brick and masses of over
burnt material brought from
the brick fields. By the above
arrangement the current was
forced round the head of the
spur D and by meeting an
impediment of the same sort
at B, was urged into the head
of the cuts which had been wi-
-dened out to receive it. Mr.
Login in describing his dissap-
-pointment in the failure of a
spur which was thrown out
in the early part of the rains
of 1853 at the point X, observes
that "it struck me that were
I to use screw piles and to tie
branches of trees and jungle to
their