Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.

3 revisions
Wjhoward at Feb 04, 2017 08:14 PM

4

The new sink in kitchen on upper floor was enclosed by a wood casing, with cupboard doors fitted therein. The water supply and drain pipes for the sink, on outside of building, were enclosed in a box. A small milk closet was made in the cellar.
Posts with a board rail at top were put up for a barb wire fence, commencing where the east boundary fence crosses the road and running west along the south side of the road to the bluff; then southerly along the top of the bluff to the south end of the east boundary fence. The wire will be placed on when it is delivered by the tender.
A double gate was placed in the fence near the west end of the road and opposite the site of the new barn.
628 – Cape Foulweather.
The new barn, commenced last month,

4

The new sink in kitchen on upper floor was enclosed by a wood casing, with cupboard doors fitted therein. The water supply and drain pipes for the sink, on outside of building, were enclosed in a box. A small milk closet was made in the cellar.
Posts with a board rail at top were put up for a barb wire fence, commencing where the east boundary fence crosses the road and running west along the south side of the road to the bluff; then southerly along the top of the bluff to the south end of the east boundary fence. The wire will be placed on when it is delivered by the tender.
A double gate was placed in the fence near the west end of the road and opposite the site of the new barn.
628 – Cape Foulweather.
The new barn, commenced last month,