Sir: Gentlemen: I find the facts set forth in the petition to be
true. The 14th St. Sewer is intended to end at 60 ft
South of Marion St, so that if any now be built it
would be better to complete this end of the systemn.
I estimate the cost of such proposed improvement as follows:
400 lineal feet of pipe laid @ 1 20 per foot | 480.00 |
---|---|
1 Manhole | 50.00 |
1 Catch basin | 50.00 |
1 Ventilator | 20 -- |
Total $600.00 |
C G Heifner Sec
Very respectfull R. H. Thomson City Engr