743 [=104] (V.2)

OverviewTranscribeVersionsHelp

Facsimile

Transcription

Status: Complete

743

that it may be convenient here
=after to take advantage of these
facilities in relieving the Puttri
Superpassage by turning the
nile supply towards the
Rutmoo Dam. This change of
[direction?] would require careful
management, so as to prevent
the Torrent from coming in
contact with the Canal on
that part of its Channel lying
on the West of the [?] and
Synibas ridge, or of its gaining
admission into the Channel by
the Badshapoor Inlet, but at
the same time it is feasible,
and may be considered as a
resource in the event of the
puttri Superpassage being
overloaded.-

the Catchment Basin
of the Puttre or the tract con=
=fines within the boundaries
before mentioned has in the
design for the works which have
been constructed, been divided
into two distant areas. One of
which is connected with the
Selimpoor live of mulla, and
with a jungle tract of 10 square
miles in Superficial extent which
may be considered as subordinate
to, and lying to the East of the
[?] drainage of the Puttri the
other the Puttri itself : the first
as being unconnected with the
Hills is remarkable for throwing
off pure water unmixed with
sediment, the latter for its dis=
=[?] of sand and silt,
marked by the true characteris=
=tics of Sewalik drainage.

The subordinate area which may

Notes and Questions

Nobody has written a note for this page yet

Please sign in to write a note for this page