Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.

3 revisions
yaquinalights at Feb 25, 2017 10:38 PM

7

January 20 2

Sir:

I have to acknowledge the receipt of your letter (which was unsigned) of the 22nd December last, reporting contract for metal work for Cape Foulweather Light House tower awarded to Oregon Iron Works Company, ???

Very Respectfully,

??? H. Elliot
Major of Engineers
Engineer Secretary

Major H.M. Robert
Corps of Engineers
L.H. Engineer
Portland, Oregon

7

January 20 2

Sir:

I have to acknowledge the receipt of your letter (which was unsigned) of the 22nd December last, reporting contract for metal work for Cape Foulweather Light House tower awarded to Oregon Iron Works Company, ???

Very Respectfully,

??? H. Elliot
Major of Engineers
Engineer Secretary

Major H.M. Robert
Corps of Engineers
L.H. Engineer
Portland, Oregon