15

OverviewVersionsHelp

Facsimile

Transcription

Status: Complete


The right to use the water and lay a pipe etc. from a spring outside the reservation was purchased, and a fence has been placed around the spring, a water tank purchased, and a fence has been placed around the spring, a water tank made, and pipes are being laid connecting it with the buildings and tower to supply water to the station for fire protection and irrigation.

This station is in good order.

No. 927. Yaquina Head,

The cellar floors of the dwelling were concreted and cemented over, drain tiles put in around the buildings and the brick foot walks cemented over. The neck of the cistern was raised and the grounds around it properly drained. Further repairs are to be made to the front of the dwellings, and the required materials have been purchased and delivered at the station.

Small repairs have been made to the roof and chimneys, of the work-room attached to the tower.

Notes and Questions

Nobody has written a note for this page yet

Please sign in to write a note for this page