Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.

3 revisions
Wjhoward at Feb 04, 2017 08:16 PM

8


amount brought forward 54.00
Ground connection for rod at town 12.50
Repair pile protection at boat house 25.00
12.50
91.50

Cape Foulweather Light Station.
3 ground connections for lighting-rods @ $12.50 37.50

Tillamook Rock Light Station
ground connection for lighting rod 15.00
New hoisting engine to replace old one 1500
1515

Point Adams Light Station
Repairs to light-house road 40.00
" " ditch drain from pasture 48.00

amount carried forward 100.50

8


amount brought forward 54.00
Ground connection for rod at town 12.50
Repair pile protection at boat house 25.00
12.50
91.50

Cape Foulweather Light Station.
3 ground connections for lighting-rods @ $12.50 37.50

Tillamook Rock Light Station
ground connection for lighting rod 15.00
New hoisting engine to replace old one 1500
1515

Point Adams Light Station
Repairs to light-house road 40.00
" " ditch drain from pasture 48.00

amount carried forward 100.50