Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.

3 revisions
dougreade at Mar 05, 2019 03:43 AM

72

In tower, Carpenter's and Laborer's work to be completed -

Brick walk to be laid from rear gate to house and soil placed on surface of garden.

Cape Hancock Light Station. Wash Ty.

Completed new house and frame for fog bell in place of those destroyed by the blast of the 15" gun - Dimensions as follows. House 10 feet square by 8 feet high. Balloon frame weather boarded, painted white. Bell frame is 8 1/2 feet high from the floor and made of 10 in square timber.

In the Light House the plate glass that was broken has been replaced.

Per contract with C.F. Brown dated June 19, 1871, the new dwelling for light keeper is in course of construction, the brickwork being completed and frame up.

311

72

in tower. Carpenter's and Laborer's work to be completed -

Brick walk to be laid from rear gate to house and soil placed on surface of garden.

Cape Hancock Light Station. Wash Ty.

Completed new house and frame for fob bell in place of those destroyed by the blast of the 15" gun - Dimensions as follows. House 10 feet square by 8 feet high. Balloon frame weather boarded, painted white. Bell frame is 8 1/2 feet high from the floor and made of 10 in square timber.

In the Light House the plate glass that was broken has been replaced.

Per contract with C.F. Brown dated June 19, 1871, the new dwelling for light keeper is in course of construction, the brickwork being completed and frame up.