Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.

3 revisions
dougreade at Mar 05, 2019 05:08 AM

86

Pioneer Iron Works
San Francisco, Cal
October 12, 1871

Major H.M. Robert
Light House Engineer
Portland Oregon

Sir

Your favor of the 3rd inst. to hand. Also specifications and plans which are returned herewith -

There are various reasons why we cannot do the metal work for Foulweather L.H. at a less rate than Piegeon Point. Since we contracted for Piegon Point L.H. Wrought iron has advanced 25 per cent and cast iron about the same and owing to the scarcity there is no certainty that it will remain at its present figures.

The 1/8 sheet iron required for casing could be had two months ago for 5 1/4 (cents) per pound. It can now be had for 8 1/2 (cents) as it has to come by rail.

334

86

Pioneer ??? ???
San Francisco, Cal
October 12, 1871

Major H.M. Robert
Light House Engineer
Portland Oregon

Sir

Your favor of the ??? to hard. Also specifications and plans which are returned herewith -

There are various reasons why we cannot do the metal work for Foulweather L.H. at a less rate than Piegeon Point. Since we contracted for Piegeon Point. Since we contracted for Piegon Point L.H. Wrought iron has advanced 25 per cent and cast iron about the same and owing to the service there is no certainty that it will remain at its present figures.

The 1/8 sheet iron required for casing could be had two months ago for 5 1/4 per pound. It can now be had for 8 1/2 ??? as it has to come by mail.