5802_12_1_3_001

ReadAboutContentsHelp
Department of Parks and Recreation Monthly Report, January 1892. See full description in Digital Collections

Pages

5802_12_1_3_001_Page_1
Complete

5802_12_1_3_001_Page_1

Report on Kinnear Denny & City Parks -

Janary /92

CF224-4

Last edit about 4 years ago by StephanieJoWebb
5802_12_1_3_001_Page_2
Indexed

5802_12_1_3_001_Page_2

Seattle, 2nd Feby 1892

Department of Public Parks.

Report on progress of work for January.

"Kinnear Park."

The grading and construction in this park is now completed with the exception of about 300 feet of the protection railing along the paths on the face of the bluffs. ----

I have done considerable planting and transplanting and the men are now making pockets preparatory to covering the whole face of the bluffs with hardy vines and trailing shrubs.

List of trees, shrubs & bulbs planted in Kinnear Park during the month.

10. Abies Douglasii, Douglas' spruce, 30. Picea grandis, Grand silver fir, 15 Thuja gigantea, Giant arbor Vitae, 6 Tilia Europea, European Linden, 4 Betula alba, White Birch 6 " papyrifera, Paper Birch 1 Arbutus Menziesii, Madrone, 3 Acer macrophylla, Maple, 80 Spiraea mix'd Bridal wreath 38 Rhododendron maxima 25 Azalea

Last edit about 4 years ago by StephanieJoWebb
5802_12_1_3_001_Page_3
Indexed

5802_12_1_3_001_Page_3

4 Cerasus lauro-cerasus, cherry laurel. 500 Hyacinths, 500 Tulips, 300 Ranunculus, 300 Anemone,

Total length of walks in park 6 feet-wide wide 2634 lineal feet. 8 feet-wide 145 lineal feet. 10 feet-wide 4364 lineal ft. 12 feet-wide 103 lineal ft.

Total length of walks 4249 lineal feet. One bridge 90 feet and one 31 feet. ----

I wish to suggest the necessity of erecting a closet and toilet room for ladies and children at an expense of $150.00. ----

"Denny Park" By arrangement made through the city engineer with contractor Rice I have been able so far to secure teams free of charge to the Park Fund, thereby affecting a saving of from $20.00 to $36.00 per day. -- 1500 cubic yards of dirt moved during the month, nearly one third of the entire grading ----

Last edit about 4 years ago by StephanieJoWebb
5802_12_1_3_001_Page_4
Indexed

5802_12_1_3_001_Page_4

"City Park"

With the exception of the men necessary to run the teams the entire force is now employed in this park, clearing and grubbing.--- I have excavated and built an underground tank f or water for temporary use, 8 ft. x 8 x 11 deep. capacity 4000 gallons.---

As we are already very much crowded for room in the propagating house, I would like to be authorized to erect a lath house for protecting and hardening off plants from the hot house. Cost $50.---

I am yours respectfully James Taylor

Last edit about 4 years ago by StephanieJoWebb
Displaying all 4 pages