801

-lows

2 parts of earth lime
1 do of Soorkee

The total quantity of material
expended, and the rates charged
for the building, are exhibited in
the following table.

[table follows:]

521010 bricks of various sizes
23156 cubic feet of earth lime
11578 ___ do ___ of Soorkee

Masonry including plaster


14 7 11.8 per 100 cubic feet
[table ends]

The [Tanni?] Khoord Escape Head
and excavated channel were com-
-menced and ^[are being] completed under the
supervision of Mr. Read, and
cost exclusive of the regulating
apparatus.

Cos Rs 13204..3..7

The above gives a general
outline of the 3 escapes to which
I have before alluded, as combining
in themselves a relief to the main
channel in its passage through
the early and sandy districts of
the high land of the Doab, It
will be understood from what I
have before said, that the works
as at present constructed consist
of an escape head attached to
the canal embankments, and
a passage for the Right Rajbuha
the latter being connected with
a bridge of communication and
with a masonry fall for the pur-
-pose of overcoming superfluous
slope. The channels of escape
have also been excavated so as to
admit of an open passage for
the