5802_12_1_11_001_Page_3

OverviewTranscribeVersionsHelp

Facsimile

Transcription

Status: Indexed

2
Kinnear Park. The work upon this park has
been general maintenance of the lawns and
the walks. The further preparation and
planting out of the flower beds and
borders. for the latter work the nursery
gardeners were detailed in their execution
The large and small trees as also
the shrubbery planted out this
spring are at the present time
doing well.
In regard to the claim made against
the City for gravel the following is
submitted. Upon careful inspection
of the location of the so called gravel pit
It seemed doubtful whether said
pit is upon land designated
as Lots 10. 11.& 12. block 2 of the
Northern Addition to the City of Seattle
Upon Consultation with the City Councilor
it was advised that the location
be first fully determines. this the
Honorable Board of Public Works
authorized to be done by the City
Engineer upon our application
the survey involved is not
yet done. When done the City
Engineer will furnish us with the
results:
Denny Park. Your instructions to proceed with
the making of Plans for the Park
are being complied with- data
necessary is addedto the survey
on hand - topography for study is
2

Notes and Questions

Nobody has written a note for this page yet

Please sign in to write a note for this page