Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.
2 revisions | cgoldade at Mar 14, 2017 10:22 PM | |
---|---|---|
15
This station is in good order. No. 927. Yaquina Head, The cellar floors of the dwelling were concreted and cemented over, drain tiles put in around the buildings and the brick foot walks cemented over. The neck of the cistern was raised and the grounds around it properly drained. Further repairs are to be made to the front of the dwellings, and the required materials have been purchased and delivered at the station. Small repairs have been made to the roof and chimneys, of the work-room attached to the tower. | 15 |