5802_12_1_3_001_Page_3

OverviewTranscribeVersionsHelp

Here you can see all page revisions and compare the changes have been made in each revision. Left column shows the page title and transcription in the selected revision, right column shows what have been changed. Unchanged text is highlighted in white, deleted text is highlighted in red, and inserted text is highlighted in green color.

7 revisions
StephanieJoWebb at Mar 24, 2020 09:30 PM

5802_12_1_3_001_Page_3

4 Cerasus lauro-cerasus, cherry laurel.
500 Hyacinths,
500 Tulips,
300 Ranunculus,
300 Anemone,

Total length of walks in park
6 feet-wide wide 2634 lineal feet.
8 feet-wide 145 lineal feet.
10 feet-wide 4364 lineal ft.
12 feet-wide 103 lineal ft.

Total length of walks 4249 lineal feet.
One bridge 90 feet and one 31 feet. ----

I wish to suggest the necessity of erecting a
closet and toilet room for ladies and children
at an expense of $150.00. ----

"Denny Park"
By arrangement made through the city
engineer with contractor Rice I have
been able so far to secure teams
free of charge to the Park Fund, thereby
affecting a saving of from $20.00 to $36.00
per day. -- 1500 cubic yards of dirt moved
during the month, nearly one third of the
entire grading ----

5802_12_1_3_001_Page_3

4 Cerasus lauro-cerasus, cherry laurel.

500 Hyacinths,

500 Tulips,

300 Ranunculus,

300 Anemone,

Total length of walks in park
6 feet-wide wide 2634 lin. feet.
8 feet-wide 145 l. feet.
10 feet-wide 4364 l. ft.
12 feet-wide 103 l ft.

Total length of walks 4249 lineal feet.
One bridge 90 feet and one 31 feet. ----

I wish to suggest the necessity of erecting a
closet and toilet room for ladies and children
at an expense of $150.00. ----

"Denny Park"
By arrangement made through the city
engineer with contractor Rice I have
been able so far to secure teams
free of charge to the Park Fund, thereby
affecting a saving of from $20.00 to $36.00
per day. -- 1500 cubic yards of dirt moved
during the month, nearly one third of the
entire grading ----