1871-1900 Yaquina Head Lighthouse Letter books

OverviewStatisticsSubjectsWorks List

Pages That Mention Foulweather

1870-73 Lighthouse Board Annual Reports

45
Indexed

45

1873 Mch. 5 Foulweather Lantern vault covers - sent. From Engineer Secretary Major G. H. Elliot. To Major H. M. Roberts Corps Engineers. Sir: I have to inform you that the following articles were shipped you at Portland, Oregon, per ateamer "Rising Star" on the 26th February , 1873, by Colonel J. C. Woodruff Light House Engineer 3rd District, viz: Fourteen (14) prismatic vault covers for the Cape Foulweather Lantern ________________________________ Mch. 6. From Engineer Secretary Major G. H. Elliot. To Major H. M. Roberts Corps Engineers. Sir: General Woodruff Engineer 3rd and 4th Light House District requests funds to the amount of $ 105: to pay for 14 prismatic vault covers for the Cape Foulweather lantern. As there are no funds in the Treasury available for this purpose, you are requested to deposit that amount to the credit of the Treasure of the United Sates from the amount in your hands belonging to the appropriation for Cape Foulweather lightstation. Oregon 1871-72 and to forward the original certificate of deposit to this office. ________________________________

Mch. 7. Mouth of Columbia River ??? ???: light houses fog signal location of sites From Engineer Secretary Major G. H. Elliot. To Major H. M. Roberts Corps Engineers. Sir: You are requested to confer with Captain Spotts, the Inspector of the 12th and 13th Districts, either by correspondence or in person (at the site) as to the proper location of the small light -house and fog-signal at the mouth of the Columbia river, which you are to erect. Also in regarding to

Last edit about 7 years ago by Wjhoward
46
Indexed

46

1873 abstract of the bids so obtained will be sent to the Board with your recommendation for awards. Before the boiler are accepted they must be tested by the United States Inspector of Boilers for your (U. S.) District, and his certificate as to their strength, Vc., must be obtained before payment is made on the contract. The whistles, machinery Vc, have been ordered to be sent to you by the Engineer of the First District.

__________________________________

Apr. 7 Cape Foulweather Lantern freight From Engineer Secretary Major G. H. Elliot To Major H. M. Robert Corps Engineers Sir: Referring to your communication of the fourteenth instant relative to the bill for freight on the sixteen (16) cases and sixteen (16) pieces castings of Foulweather Lantern, you are requested to pay the amount as stated in your letter, viz: four hundred and seventeen dollars and twenty nine cents (417. 29/100) It is presumed no damages can be obtained.

__________________________________

Apr. 7 Cape Foulweather Lantern freight From Engineer Secretary Major G. H. Elliot To Major H. M. Robert Corps Engineers Sir: Herewith please find invoice of duplicates of the parts of Cape Foulweather lantern, which were thrown overboard at sea. Major Michler, Engineer of the Twelfth District has been directed to make such dispositions of the packages as you may request; the freight therefor to be paid by you from the appropriation for Cape Foulweather Light House

Last edit about 7 years ago by Wjhoward
47
Indexed

47

1873 Apl. 9.

From Engineer Secretary Major G. H. Elliot. To Major H. M. Robert. Corps Engineers.

Sir: There is required the sum of $803.58 to pay for duplicate parts of the Cape Foulweather lantern. If that amount can be spared from the appropriation, you will please deposit it at once and forward certificate of deposit to this office.

_________________________________________________

Apl. 24.

From Engineer Secretary Major G. H. Elliot. To Major H. M. Robert. Corps Engineers.

Sir: In reply to your letter of the 9th instant, recommending that beacons be placed on Sand Island, and on "the rock" by the wreck of the ship "Silvie de Grace" at the mouth of the Columbia River, you are informed that no funds can be expended this year for either purpose, but you are requested to present the matter in your annual estimates.

_________________________________________________

Apl. 26.

From Engineer Secretary Major G. H. Elliot. TO Major H. M. Robert Corps Engineers.

Sir: Referring to your letter of the seventh instant relative to the location of a Light House and steam fog signal at the mouth of Columbia River, I have to state that the views of yourself and Captain J. H. Spotts, U.S.A. Inspector, on this matter are approved, and that the exact site will not be fixed until you and he can visit the locality in person and select it with a view to its permanency on account of the encroachments of the sea, and the lateral range of the light. The Light House will be of a class called

Last edit about 7 years ago by Wjhoward
48
Indexed

48

1873

"C" of which plans and specifications will be sent you, and both it and the fog - signal house will be built by contract. Authority will be asked at once from the Honorable the Secretary of the Treasury for your publication of a notice of the form herewith and you will send and abstract of the bids received for approval to the Board, with your recommendation in regard to the award. A lantern will be sent to you on your requisition, and it should include all the lanterns which will be required in your District under existing appropriations. A twelve inch (12") steam for whistle, with everything connected therewith has been ordered to be made by the Engineer of the First District and sent to you. A syren is not considered as desirable at Point Adams, on account of the drifting sand and its liability to get out of order. Application should be made at once to the State authorities (if the land has passed out of the control of the Government) for sufficient land, extending southward from the Military reservation, to cover the proposed site. If the land is yet under the control of the General Land Office, immediate application should be made to the Board by you (telegraph) for its reservation from sale by his Excellency, the President.

_________________________________________

Apl. 28. Cape Foulweather Lighthouse

From Engineer Secretary Major G. H. Elliot. To Major H. M. Robert, Corps Engineers.

Sir: You are requested to telegraph to the Board the date at which the Light at Cape Foulweather can be lighted as soon as you can determine the

Last edit about 7 years ago by Wjhoward
49
Indexed

49

1873.

"C" of which plans and specifications will be sent you and both it and the fog-signal house will be built by contract. Authority will be asked at once from the Honorable the Secretary of the Treasury for your publication of a notice of the form herewith and you will send an abstract of the bids received for approval to the Board, with your recommendation in regard to the award.

A lantern will be sent to you on your requisition, and it should include all the lanterns which will be required in your District under existing appropriations. A twelve inch (12") steam fog-whistle, with everything connected therewith, has been ordered to be made by the Engineer of the First District and sent to you. A ??? is not considered as desirable at Point Adams, on account of the drifting sand and its liability to get out of order.

Application should be made at once to the State authorities (if the land has passed out of the control of the Government) for sufficient land, extending southward from the Military reservation, to cover the proposed site. If the land is yet under the control of the General Land Office, immediate application should be made to the Board by you (telegraph) for its reservation from sale by his Excellency, the President.

_____________________________________________________

Apl. 28. From Engineer Secretary Major G. H. Elliot. To Major H. M. Robert. Corps Engineers.

Sir: You are requested to telegraph to the Board the date at which the Light at Cape Foulweather can be lighted as soon as you can determine the

Last edit about 7 years ago by Wjhoward
Displaying pages 116 - 120 of 125 in total